Gerry :)
Our journey into the wonderful world of small homebuilt camping trailers.
Sunday, July 10, 2011
Paint and lights
Spent the week end sanding, painting and installing some lights. I also worked on the kitchen instead of watching the paint dry.
Sunday, July 3, 2011
Projects as it sits right now
I'm down the wire so I don't have much time to blog. This trailer has to be ready for vacation in 2 weeks. It's a lot more work than I ever imagined.
But it will be all worth while in the end to be able to camp anywhere without spending a fortune.
Here are some pictures.
It might not be 100% finished in 2 weeks but it will be useable for camping.
see ya later.
Gerry :)
But it will be all worth while in the end to be able to camp anywhere without spending a fortune.
Here are some pictures.
It might not be 100% finished in 2 weeks but it will be useable for camping.
see ya later.
Gerry :)
Update one on the build
After a gallon of roof tar the floor was flipped over, bolted and it was time for the walls.
It's like building a big model airplane.
This is what the project looked like when I started again this spring.
I then changed the tires for bigger ones, skinned the interior, varnished it and had my now graduated Electro-Mechanic son wire the whole thing for me.
All that I have left to do is finish skinning the roof, install the lights, fiberglass the exterior, paint, make doors and get a hitch on my HIghlander. This has to be done and ready to camp by the second week of July.
Gerry :)
All that I have left to do is finish skinning the roof, install the lights, fiberglass the exterior, paint, make doors and get a hitch on my HIghlander. This has to be done and ready to camp by the second week of July.
Gerry :)